Budget Calculator
    • Budget

    Spendings per section

    • Equipment
    • Business Service
    • Setup Fee*
    • Food
    • Beverages
    • Packages

    Total spendings

    • On this page
    • All sections
    • Rest Budget

    • Room-Rental**
    • * When booking a conference packages for all participants included.
      ** The room rental reduces itself proportionately to your lodging costs and food and beverage consumption
    Name Unit Price Amount

    Freight lift

    The freigt lift (loading capacity 2.000 kg) is located at the backside of the hotel. Dimensions 2,80 x 1,50 x 2,20 m (5,60 x 2,40 x 2,10).

    Loading ramp

    The loading ramp is located in the Hitzigallee, at the backside of the hotel. Height of the loading ramp 0,90 m.


    Strom

    220 Volt, 50 Hertz, 16 Ampere – high voltage current on request.


    Technical Equipment in the conference area

    stagecraft in hall MARITIM - 2,400.00 € (incl. lighting, proscenium, traction modes etc. )
    stagecraft in hall Berlin - 1,200.00 € (incl. lighting, proscenium, traction modes etc. ) incl. 1 technician (8 hours)
    ceiling suspensions per day 30.00 €
    traction modes per day 50.00 €


    Technics

    - Permanetly installed technical equipment must only be dismantled or re-fitted by the hotel’s own technical staff. If permanently installed technical equipment (CEE sockets, grounding outlets, spotlights, loudspeakers etc.) has been damaged, the organizer shall bear the repair costs.
    - The organizer shall meet the technical parameters and dimensions.
    - The black-out curtains in all exhibition rooms are operated electrically, manual operations are basically not permitted.
    - All facilities for suspending loads can only be used after the necessary arrangements with the hotel’s technical department have been made. The maximum loads must not be exceeded.
    - When connecting several conference halls by cables, the existing cable penetrations shall be used.

    Limits for the power consumption:
    Hall MARITIM - 250 Ampere
    Hall Berlin - 250 Ampere
    Hallfoyer - 32 Ampere

    Conditions imposed by the fire departement

    - The regulation of the Assembly Room Directive shall apply.
    - Fire protection equipment and installations shall be kept freely accessible and in working order. It is not permitted to park vehicles or place other items in the resue paths and on the operating space of the fire department.
    - Fire gates and doors must not be obstructed.
    - Emergency exit signs must not be covered and emergency exits must not be obstructed.
    - If cars will be exhibit, the battery shall be disconnected and the tank must not contain more than 3 litres of fuel.
    - Cars shall only be pushed and not driven in closed rooms.
    - As a matter of principle, the space below the engine shall be covered with protective mats.
    - Decorations, technical and exhibited equipment as well as exhibition stands shall be made of hardly flammable materials.
    - The general conditions for organizing fireworks in the MARITIM Hotels shall be observed.

    Deliveries

    - Vehicles can be unloaded and loaded in the Hitzigallee, where the incoming goods reception and the goods elevators are located.
    - The organizer of the event must apply for the stop permit for vehicles to the police authorities under the following address:

    Bezirksamt Mitte von Berlin
    Abteilung Stadtentwicklung
    Straßen- und Grünflächenamt
    Straßenverkehrsbehörde
    Frau Carola Engert
    Rosa-Luxemburg-Strasse 14
    10178 Berlin
    Tel.: 030 2009 22 854
    Fax: 030 2009 22 766

    ABS Handelsgesellschaft mbH
    Straßenabsperrung
    Germaniastrasse 140
    12099 Berlin
    Tel: 030 – 75 79 51 0
    Fax: 030 – 75 15 164

    Miscellaneous

    - No articles shall be stuck on or glued to the columns, walls, screens and mirrors, nor shall any nails or decorative needles be put in.
    - The organizers may put up their individual signposts on the stands provided after having made the relevant arrangements with the hotel management.
    - The dismantling work in the rented rooms shall be completed by the time specified as the rooms must be expected to have been rented out again.
    - The hotel shall be informed about the expected extent of decorations ond other assembly work.
    - The hotel does not assume liability for any items lost or damaged.
    - The organizer shall register directly for the payment of GEMA fees.