* When booking a conference packages for all participants included.
** The room rental reduces itself proportionately to your lodging costs and food and beverage consumption
NameUnitPriceAmount
Loading ramp
The loading ramp is located at the entrance 6000 and can carry a load of 2 tons.
Freight lift
You will find the freight elevator (loading capacity 4775 kg or pressure 5kN/m²) close to the entrance 6000, which is located in the front of the congress center. The measurements of the doors of the freight elevator are 2,10 x 2,20 x 2,40 m (height x width x depth).
400 A connection in the Great Hall ---upon consumption
high-voltage ---current upon consumption
Technical equipment in the halls
In the halls and the conference rooms you will find various hanging points (load-bearing capacity from 500kg to 2 tons – depending on location) in a raster of 2.5m. The charge is € 5,00 (self installed) or € 25,00 (installed by us) per piece per day.
Great Hall
Screen: Width 8,0 m Height 7,0 m, blackend 1 m at the top Weight: 630 kg Moving mechanism: appr. 8,0 m Type: MW Panorama Jumbo 36/36
Stage: permanently installed stage 16 x 5 m small movable stage 5 x m middle stage element 21 x 3 m movable front stage element 19 x 3,50 m
Top of stage Height 1,20 m Lichclear width from top of stage 7,80 m
LCD projector permanently installed 1 x 12.000 ANSI-Lumen
Hall1 / Hall 2/ Hall 4
Screen: Width 6,0 m Height 6,0 m, blackend 1,5 m at the top Weight: 400 kg Moving mechanism: appr. 11,5 m Type: MW Panorama Jumbo 36/36
Conference 1
Screen Backprojection screen Width: 4,0 m Height: 4,0 m Weight: 200 Kg Typ3: MW Panorama Gigant Durchlichtprojektion
Stage movable elements Height up to 1 m Width 7 m Depth 2 x 1 m
Screen Width: 3,0 m Height: 3,0 m Weight: 35 kg movable elements: ca. 2,5 m Typ: MW Rollfix Electric
Delivery
A delivery into the halls is (all around the building) possible, even directly to the stage of the Great Hall, since it is at ground level.
Technical conditions
- Extension of or modification to fixed installation technical facilities may only be undertaken with the prior approval of the ICD and must be carried out by in-house building services. - In the event of damage to fixed technical items (CEE power points, push-plug sockets, spotlights, loudspeaker etc.) the organizer undertakes to bear any maintenance costs. - The organizer is responsible for observing technical data and measurements - Room lighting dimming is electrical in all rooms and manual operation is forbidden. - The use of existing suspension facilities is only allowed in agreement with the building services and must be within the maximum permissible loads. - Cabling in the respective rooms must be via the cable ducting provided.
Fire service conditions
- The regulations of the Places of Assembly Ordinance apply. - Fire prevention installations must be freely accessible and able to function. - Parking vehicles or placing other objects on escape routes, parking and moving areas reserved for the fire service is forbidden. - Fire doors and gates must not be blocked. - Emergency exit signs must not be covered, emergency exits must not be blocked. - In the case of exhibition vehicles the battery must be disconnected and the tank must contain no more than 3 litres of fuel. - In closed rooms vehicles may only be pushed. - Protective matting must be placed under the engine compartment and tyres. - Decorations, furnishings and exhibition booths must only consist of materials highly resistant to fire. - The conditions for carrying out fire works in Maritim Hotels must be observed.
Miscellaneous
- Sticking items on columns, walls, screens and mirrors etc. as well as hammering in nails or decorative pins in columns, curtains and walls is forbidden in the entire ICD. - Individual signage by the event organiser may only be used after prior approval of the ICD. - Dismantling work must be completed within the agreed time period. - For setup work after 10 pm a technician must be present. The technician will be charged at € 35,00 per hour incl. of VAT. - The ICD shall be notified regarding the scope of anticipated decoration and setup work. - Should the setup of exhibitions / events involve valuable goods a security person must be hired. - GEMA fees hall be notified and settled directly by the organiser.