Budget Calculator
  • Budget

Spendings per section

  • Equipment
  • Business Service
  • Setup Fee*
  • Food
  • Beverages
  • Packages

Total spendings

  • On this page
  • All sections
  • Rest Budget

  • Room-Rental*/**
  • * When booking a conference packages for all participants included.
    ** The room rental reduces itself proportionately to your lodging costs and food and beverage consumption
Name Unit Price Amount

Electricity

Schuko electrical outlet (230 V, triple outlet) per day 9.80 €
16A CEE connection per day 55.00 €
32A CEE connection per day 75.00 €
63A CEE connection per day 120.00 €
125A CEE connection - upon consumption
400 A connection in the Great Hall - upon consumption
high-voltage - current upon consumption


Freight lift

You will find the freight elevator (loading capacity 4775 kg or pressure 5kN/m²) close to the entrance 6000, which is located in the front of the congress center. The measurements of the doors of the freight elevator are 2,10 x 2,20 x 2,40 m (height x width x depth).


Technical equipment in the halls

In the halls and the conference rooms you will find various hanging points (load-bearing capacity from 500kg to 2 tons – depending on location) in a raster of 2.5m. The charge is € 5,00 (self installed) or € 25,00 (installed by us) per piece per day.

Great Hall

Screen:
Width 8,0 m
Height 7,0 m, blackend 1 m at the top
Weight: 630 kg
Moving mechanism: appr. 8,0 m
Type: MW Panorama Jumbo 36/36

Stage:
permanently installed stage 16 x 5 m
small movable stage 5 x m
middle stage element 21 x 3 m
movable front stage element 19 x 3,50 m

Top of stage
Height 1,20 m
Lichclear width from top of stage 7,80 m

LCD projector
permanently installed
1 x 12.000 ANSI-Lumen

Hall1 / Hall 2/ Hall 4

Screen:
Width 6,0 m
Height 6,0 m, blackend 1,5 m at the top
Weight: 400 kg
Moving mechanism: appr. 11,5 m
Type: MW Panorama Jumbo 36/36

Conference 1

Screen
Backprojection screen
Width: 4,0 m
Height: 4,0 m
Weight: 200 Kg
Typ3: MW Panorama Gigant Durchlichtprojektion

Stage
movable elements
Height up to 1 m
Width 7 m
Depth 2 x 1 m

Stage box
Width: 3,97 m
Depth: 3,69 m

Conference 2 / Conference 3 / Conference 4 / Conference 5

Screen
Width: 4,0 m
Height: 4,5 m
Weight: 105 Kg
movable elements: ca. 5,0 m
Typ: MW Panorama Jumbo 20/20

Conference 6

Screen
Width: 5,5 m
Height: 5,5 m, davon oben 0,5 m geschwärzt
Weight: 355 Kg
movable elements: ca. 3,0 m
Typ: MW Panorama Jumbo 36/36

Seminar 1

Screen
Width: 4,5 m
Height: 4,5 m
Weight: 230 Kg
Typ: MW Panorama Jumbo 27/27

Seminar 2

Screen
Width: 4,5 m
Height: 4,5 m
Weight: 230 Kg
movable elements: ca. 3,5 m
Typ: MW Panorama Jumbo 27/27

Seminar 3 / Seminar 4 / Seminar 5 / Seminar 6 / Seminar 7

Screen
Width: 3,0 m
Height: 3,0 m
Weight: 35 kg
movable elements: ca. 2,5 m
Typ: MW Rollfix Electric


Loading ramp

The loading ramp is located at the entrance 6000 and can carry a load of 2 tons.


Delivery

A delivery into the halls is (all around the building) possible, even directly to the stage of the Great Hall, since it is at ground level.

Technical conditions

- Extension of or modification to fixed installation technical facilities may only be undertaken with the prior approval of the ICD and must be carried out by in-house building services.
- In the event of damage to fixed technical items (CEE power points, push-plug sockets, spotlights, loudspeaker etc.) the organizer undertakes to bear any maintenance costs.
- The organizer is responsible for observing technical data and measurements
- Room lighting dimming is electrical in all rooms and manual operation is forbidden.
- The use of existing suspension facilities is only allowed in agreement with the building services and must be within the maximum permissible loads.
- Cabling in the respective rooms must be via the cable ducting provided.

Fire service conditions

- The regulations of the Places of Assembly Ordinance apply.
- Fire prevention installations must be freely accessible and able to function.
- Parking vehicles or placing other objects on escape routes, parking and moving areas reserved for the fire service is forbidden.
- Fire doors and gates must not be blocked.
- Emergency exit signs must not be covered, emergency exits must not be blocked.
- In the case of exhibition vehicles the battery must be disconnected and the tank must contain no more than 3 litres of fuel.
- In closed rooms vehicles may only be pushed.
- Protective matting must be placed under the engine compartment and tyres.
- Decorations, furnishings and exhibition booths must only consist of materials highly resistant to fire.
- The conditions for carrying out fire works in Maritim Hotels must be observed.

Miscellaneous

- Sticking items on columns, walls, screens and mirrors etc. as well as hammering in nails or decorative pins in columns, curtains and walls is forbidden in the entire ICD.
- Individual signage by the event organiser may only be used after prior approval of the ICD.
- Dismantling work must be completed within the agreed time period.
- For setup work after 10 pm a technician must be present. The technician will be charged at € 35,00 per hour incl. of VAT.
- The ICD shall be notified regarding the scope of anticipated decoration and setup work.
- Should the setup of exhibitions / events involve valuable goods a security person must be hired.
- GEMA fees hall be notified and settled directly by the organiser.